Need this roof reviewed?
Active local weather warning
The National Weather Service has issued a coastal flood warning covering Hollywood. Heavy rain and drainage loading can expose roof leaks, blocked drains, and ponding water. This is a weather exposure advisory; it does not establish damage to a specific roof.
Do not access a roof during hazardous weather. Protect people first, avoid water near electrical equipment, and request roofing help when conditions permit.
National Weather Service · Updated Oct 28, 2026, 9:39 AM UTC
Low-slope and metal roof repair, replacement and maintenance for buildings in the Davie Industrial Area of Davie, FL, with plans for dock hours and road work.
Water that stays on an industrial roof for a day after rain is telling the owner something about the drainage plane, and in the Davie Industrial Area that message deserves a close reading. The Town describes redevelopment and road-improvement activity in the area, and it points to a pharmaceutical research-and-manufacturing business as an example of the industry mix it targets. A building serving that kind of use may carry equipment on the roof, controlled conditions inside and a schedule that does not bend easily. Our work here covers commercial roof repair, replacement, recover, coating and maintenance, and every visit begins on the roof so that the plan follows the observed condition and not an assumption about the age of the building.
An area under redevelopment and road improvement brings changes that reach roofs indirectly. Construction nearby puts dust and debris on membranes and into drains. New tenants add equipment. Ownership changes bring requests for condition records. Each of those events is a reason to walk the roof and update the record so it matches the building as it stands today.
Timing the work is the practical question. A roof that will carry a new tenant's rooftop units is better repaired or replaced before the equipment arrives, since the unit pads, curbs and conduit routes can be detailed correctly once instead of being cut into a finished membrane. When the future of a building is uncertain, a targeted repair or coating can hold the roof through the decision without committing to a full replacement.
The City also says its CRA took part in property-tax incentive support for a qualified target industry in the area. A building in an area with that kind of incentive activity may change hands or tenants, and a dated condition report with a repair history answers a buyer's or tenant's roof questions before they are asked.
Hollywood's NOAA normals give June 8.84 inches of rain and September 8.67, with August highs averaging 89.9°F. Those two numbers describe the stress cycle on a flat industrial roof: heavy water in the wet months and high surface temperature in the hot ones. That cycle is why we check the outlets, the slope toward them and the membrane at every transition.
On a wide industrial roof, small settlements matter. A bay that sags between purlins can hold water for days, and the membrane in that bay ages faster than its neighbors. We measure the ponding depth, note how long it lasts and compare it with the position of the nearest outlet. Ponding water repair can then address slope, outlet location or insulation compression according to what the measurements show.
The Town's own example of its targeted industry mix is a pharmaceutical research-and-manufacturing business, and buildings that house controlled processes tolerate water entry poorly. Moisture, dust and odor can affect work below, so the first walk records the roof above each sensitive space and the details that sit over it: exhaust stacks, make-up air units, curbs, pipe supports and any skylights.
We check each penetration for sound flashing and reinforced corners, and we note sealant that has been added over a flashing instead of repairing it. If a leak is active, temporary protection goes in before permanent work is scheduled, and the sequence is agreed with the facility contact so that tear-off, hoisting and welding do not disturb the interior. A roof record that ties each finding to a location also helps when an inspector or auditor asks how the building envelope is maintained.
Heat adds to this. Rooftop units reject warm air onto the membrane beside them, and a surface that sits well above air temperature ages at the edges of those units first, so we probe the seams there before we look elsewhere.
Industrial buildings in South Florida carry several roof types, and the correct repair respects what is already there. A metal roof depends on fastener, seam and panel condition; a single-ply membrane depends on its welds and flashings; a built-up or modified bitumen roof depends on its surfacing and layer attachment. We identify the system before choosing a method, and we explain why a patch material suits it.
When findings extend beyond a local repair, we compare a recover, a coating and a full replacement. What settles it is wet insulation, how well the membrane is attached, the state of the deck and how many details would have to be rebuilt. Cost and timing follow access, roof area, penetrations and the operating schedule below, and the proposal lists those drivers so the owner can see how each option was reached.
Roof work in an industrial area has to coexist with trucks, forklifts and, in this case, road-improvement activity. We plan access, staging and hoisting around dock hours and around any lane closures the manager knows about. Trucks bring material when the yard is quiet, the lift stays clear of active doors, and each section is closed to weather before the crew goes home.
Where roof access shares a route with a road project, the manager can tell us about closures and detours so the delivery plan avoids them. We also keep a walkway plan for the roof so that service technicians reach their equipment without crossing open seams.
A short roof file pays off when a property changes hands or a tenant renews. It should hold the condition report, photographs from each visit, repair invoices, drain-cleaning notes and any permit paperwork. Permit records belong in the same file: reroof permits are confirmed with the Town's building staff, and the 2023 eighth edition is the Florida Building Code now in force.
A due-diligence roof survey gives a buyer or lender the same information in a form that stands alone. An owner with property in Davie proper or in the Pembroke Pines industrial parks can run every building from one file, and a preventive maintenance visit before the rains start keeps outlets clear.